ADUs, DADUs & additions · King County & the Eastside

Find out what fits in your backyard — and what it could earn.

We design, permit and build detached DADUs, attached ADUs and home additions across King County — for rental income, for family, for long-term value. Before you spend a dollar, we check your lot against zoning, critical areas and utilities — free.

Free · no obligation · we reply within one business day

Licensed WA general contractor · ELEVAPL755NL · Bonded & insured · Bellevue & Greater Seattle

ADUs, DADUs & additions · King County

What a DADU is — and why Washington law now makes it easy.

A DADU is a detached accessory dwelling unit — a separate little cottage on your own lot. An AADU is the same idea attached to your house or built into a garage. Under Washington's HB 1337 (RCW 36.70A.680), cities within urban growth areas — which covers nearly all of our service area — must allow up to two ADUs per lot in addition to your house, at a minimum of 1,000 sq ft and no owner-occupancy requirement — so you can rent out both units long-term (short-term rental rules vary by city). And many cities go bigger: Seattle, Bellevue and much of the Eastside now allow a detached DADU up to 1,200 sq ft (Bellevue at 24 ft tall, LUC 20.20.120). What actually fits your lot is exactly what the free feasibility study confirms.

Home additions are the third thing we build here: expanding your existing house — a new room, a second story, a bigger kitchen. An addition grows your home rather than creating a separate dwelling, so the ADU-specific rules (renting it out, selling it separately) don't apply — but the feasibility, permitting and build process is the same, and it still starts with a free lot review.

A modern detached backyard cottage (DADU) with James Hardie fiber-cement siding behind a Pacific Northwest craftsman home
Why homeowners build

Three reasons homeowners build a backyard unit.

Every lot is different — but almost every ADU we build comes down to one of these three. The free feasibility study tells you which one your lot can deliver.

A detached backyard rental ADU with its own private entrance and covered porch
Rental income

Rent it out, long-term

Backyard units on the Eastside typically ask $1,800–$3,500/mo in long-term rent, and state law lets you rent out both your home and the ADU. What yours could earn depends on size, location and finish — the study gives you a real picture. Typical asking rents, not a projection.

A warm living room inside an ADU set up as independent living space for a parent
Family, with privacy

Family under one roof

Independent living for parents or adult kids — their own front door, kitchen and bathroom, just steps from home. The same idea works as an addition when you'd rather grow the house you're in.

An aerial view of a property with a main house and a new backyard DADU adding value
Long-term value

Build equity you can sell

An ADU can add six figures to resale value — appraisers and lenders now count them. And Washington law now allows ADUs to be sold separately as condominiums in many cases; the process and cost depend on your city. Market data, not a projection or financial advice.

How it works

From "can I build?" to keys — one team, five steps.

One licensed crew from the first lot check to the final walk-through — no handoffs between a designer, a permit expediter and a builder who've never met.

  1. 1

    Free feasibility study

    A desktop check of zoning, setbacks, critical areas, trees, easements and utilities. You get a written verdict — what fits and what drives the cost — before spending anything.

  2. 2

    Pre-construction

    Survey, title and city and utility confirmations — we verify on the ground what the desktop study flagged, so there are no surprises later.

  3. 3

    Design & permits — one flat fee

    Architectural, structural and MEP drawings, energy-code report, full submission and correction handling — one flat design-and-permitting fee for a standard detached ADU. After you sign, you work with our architects directly; we manage the process. See the flat-fee estimate →

  4. 4

    Construction

    One dedicated crew builds it, finished in the James Hardie fiber-cement siding we already specialize in.

  5. 5

    Walkthrough & keys

    A room-by-room punch list, then move-in — backed by our written workmanship warranty.

Typical timing: design about two months · permit review two to six months depending on your city (unincorporated King County ~2 months; a custom Seattle DADU toward the top of the range) · construction four to ten months. Review times are set by your city and outside any builder's control — these are typical ranges, not promises.

Our work

A real King County lot, checked.

Elevation Pro crew exterior work — James Hardie fiber-cement siding on a Pacific Northwest home
Appears feasible — subject to verification.
  • Zoning allowed two detached DADUs
  • Up to 1,200 sq ft each
  • Critical-area layers came back clear

That's what a feasibility study looks like: your lot run against the zoning code and every King County GIS critical-area layer, ending in a plain-English verdict — never a bare yes or no, but "appears feasible, subject to verification," with the exact list of what to confirm next. The photo is our own crew's exterior work — the Hardie fiber-cement finish that goes on every home we build.

Why us

Why a leaner builder is the better deal on an ADU.

The same end-to-end process as the big Seattle DADU firms — from a leaner company, with the owner still on the phone.

Feasibility is free — always

We check whether your lot works before you pay for anything. If it doesn't pencil, you'll know — and it costs you nothing.

One flat design-and-permitting fee

You know the number before you commit. City fees, surveys and city-required studies are itemized separately — nothing buried.

The owner answers your calls

A small team means the people who priced your project are the ones building it — no sales layer between you and the builder.

Hardie fiber-cement standard

We finish every home in James Hardie fiber-cement siding — the exterior standard that clears the strictest city material rules for ADUs.

ELEVAPL755NL — WA registered contractor $30,000 surety bond $1M / $2M liability Verify our license on L&I (opens in a new tab)
What it costs

What a detached ADU really costs in King County.

Honest ranges, not bait numbers. Turnkey detached ADUs run about $290 per square foot in King County — the exact number for your project comes after the free lot check.

TypeSizeTypical turnkey range
Compact studio / 1-bed~600 sq ft$165K–$195K
2-bedroom detached ADU800–1,200 sq ft$230K–$350K
Garage / basement conversion (AADU)variesfrom ~$90K

"Turnkey" means foundation, utility connections, kitchen and appliances, finishes and final inspections — move-in ready, not a shell. Ask us to price your project against any competing quote.

Questions

What homeowners ask before building.

Elevation Pro Construction ADU specialist

Still have questions?

Talk to an ADU builder

No pressure — clear answers about your lot, your city's rules and what a build involves.

Get my free feasibility study → (425) 394-8849
Licensed, bonded & insured WA general contractor — Lic# ELEVAPL755NL, $1M/$2M liability. Detached & attached ADUs up to 1,200 sq ft across Greater Seattle. Verify on L&I.
How many ADUs can I build on my lot in King County?
In most King County cities within urban growth areas, Washington's HB 1337 (RCW 36.70A.680) requires cities to allow up to two accessory dwelling units per lot in addition to your house — one attached (AADU) and one detached (DADU), or two of one kind depending on your city — at a minimum of 1,000 square feet, and up to 1,200 square feet in Seattle, Bellevue and many Eastside cities, with no owner-occupancy requirement. Rural unincorporated lots follow county rules. Exactly what fits on your specific lot is what the free feasibility study answers.
Do I have to live on the property?
No, not for long-term rentals under Washington's ADU law — you can rent out both your home and the ADU. Short-term rental rules vary by city, so we confirm your city's rules for your project.
Can I sell my ADU separately?
Often, yes. Washington law now allows ADUs to be sold separately as condominium units in many cases. The exact process and cost depend on your city, so ask us about yours.
How long do ADU permits take?
It varies by city. Design typically takes about two months, and city permit review runs roughly two to six months depending on the jurisdiction — unincorporated King County often around two months, while a fully custom Seattle DADU is toward the top of the range; pre-approved plans are reviewed faster. Construction is typically four to ten months. Review times are set by your city and outside any builder's control — these are typical ranges, not promises.
What does the feasibility study cost?
Nothing. Our feasibility study is free, always. We check your lot against zoning, setbacks, critical areas and utilities and send you a written verdict before you spend a dollar.
What is your design and permitting fee?
Our design-and-permitting package is one flat fee for a standard detached ADU — you'll know the number before you commit. City permit fees, surveys and any city-required studies are separate; we itemize them for your city before you sign. If your site needs more than the standard scope, we tell you that upfront, in writing.
Do you build home additions, not just ADUs?
Yes. Alongside attached AADUs and detached DADUs we build home additions — expanding your existing home with a new room, a second story or a larger kitchen. An addition extends your house rather than creating a separate dwelling, so the ADU-specific state rules (renting it out, selling it separately) don't apply — but the feasibility, permitting and build process we run is the same, and it still starts with a free lot review.
Which cities do you build ADUs in?
We serve King County and the Eastside — Bellevue, Seattle, Kirkland, Redmond, Renton, Sammamish, Kent and nearby. Tell us your address and the free feasibility study confirms whether we cover it and what your city allows.
Start your project

Check your lot before you spend a dollar.

Send your address and we'll run the free feasibility study — a written verdict on what fits, what drives the cost, and what could bite. No obligation.

  • Free desktop feasibility study
  • A written verdict: what fits, what drives the cost
  • We reply within one business day
  • Prefer to talk? (425) 394-8849

Get your free feasibility study

Send your address — we'll check your lot and reply within one business day.

Free · no obligation · your address is used only for the study. We reply within one business day. See our Privacy Policy.

Get my free feasibility